Public Projects

Bids due in 9 days
10/13/26 10:00am
2026 On-Call Capital Construction Contract
Bids due in 9 days
Marin Water
The work to be done will be located within the District’s service area, which includes the Counties of Marin and Sonoma, California.
DESCRIPTION: The on-call contract is for furnishing labor, equipment, and materials for the maintenance, repair, or rehabilitation of District water system facilities, roadway infrastructure, hillside slopes, and related works for a total amount of up to One Million Dollars ($1,000,000).
Bids due in 22 days
10/26/26 5:00pm
Electronic bidding
RFQ - On-Call Habitat Restoration & Vegetation Maintenance Services
Bids due in 22 days
East Bay Regional Park District
The East Bay Regional Park District (Park District) manages approximately 127,000 acres of parkland and multiple park facilities in Alameda and Contra Costa counties. The Park District is issuing this Request for Statement of Qualifications (RFQ) to identify firms to support the Design & Construction Department in a variety of areas related to habitat restoration and vegetation management services (see Scope of Services).
Bids due in 4 days
10/8/26 10:00am
F26001 FFIP Hillside Ave. Pipeline Replacement Project
Bids due in 4 days
Marin Water
The work to be done is in the Town of Fairfax and the Town of San Anselmo in Marin County, California.
Description: This contract is for furnishing labor and equipment for the installation of approximately 7,900 linear feet of 8-inch, 6-inch, and 4-inch welded steel pipe and 6-inch PVC pipe with valves, fittings, pipe disinfection, and appurtenances.
Bids due in 16 days
10/20/26 2:00pm
NBR Potable Water Reservoirs Cleaning & Inspection Project 2027
Bids due in 16 days
City of Fairfield, CA
Fairfield, CA
General Work Description: The Various Potable Water Cleaning and Inspection Project generally consist of, but is not limited to, interior cleaning of City of Fairfield above ground steel reservoirs treatment plant facilities, underground reservoirs, conduits, and high lift pump station sumps. The work also includes removing and disposing of any debris, sediment, or sludge, performing interior inspection and documentation of all surfaces (roof, walls, floor, hatches, man ways, etc.) and appurtenances (piping, support columns, ladder, cathodic protection, monitoring equipment, etc.), providing written repair recommendations for distressed areas (if any), minor spot repairs, de-chlorination and filtration of cleaning discharge, installation of flowmeter on discharge, dechlorination sampling, maintain reservoir quality (disinfection) at all times, and other items of work called for in the plans, specified in the Special Provisions, and as directed by the City Engineer. The facilities identified for this project at the North Bay Regional Water Treatment Plant include: Treated-Water Pump Station Sump (TWPS), Chlorine Contact Basin (CCB), and Settled- Water Conduit (SWC).
Bids due in 25 days
10/29/26 3:00pm
San Juan Avenue Complete Streets - Phase 1B - RFP
Bids due in 25 days
City of Citrus Heights
Citrus Heights
The San Juan Avenue Complete Streets Project – Phase 1B is a sidewalk infill project with pavement rehabilitation of San Juan Avenue from Chesline Drive to Spicer Drive. The Project scope of work includes: • Repair and install curb, gutter and sidewalk concrete medians • Install ADA and transit bus stop improvements • Storm drainage improvements • Water main modifications • Retaining walls • Pavement rehabilitation • Signing and striping • Traffic signal modifications • Traffic signal interconnect • Street lighting.
Bids due in 3 days
10/7/26 2:00pm
Vista Neighborhood Roadway Rehabilitation MU 3027 Project
Bids due in 3 days
City of Yountville
Yountville Town Hall 6550 Yount Street, Yountville CA 94599
General Description of Work: The work generally consists of mobilization, developing, implementing and maintaining a traffic control system and water pollution control program, cold planing, removing and disposing of existing pavement, placement of hot mix asphalt materials, lowering and adjusting utility covers, installing traffic striping, pavement markings, and roadside signs, cleanup of the project areas, and other items of work as shown in the contract documents.
Bids due tomorrow at 2:00pm
10/5/26 2:00pm
Electronic bidding
CUPCCAA 10-Day Informal Bid for Serra Adult School Exterior Painting
Bids due tomorrow at 2:00pm
WCCUSD
WCCUSD
The project involves exterior painting work including but not limited to the following: Contractor shall furnish all labor, materials, equipment, and supervision to remove/prepare existing failed or peeling exterior paint, (assume existing paint contains Lead) patch damaged surfaces and apply one (1) coat of primer and two (2) coats of finish paint to all designated exterior surfaces, including wood sidings, masonry/stucco/concrete/ CMU wall surfaces, Ramps, Roof Fascia, Gutter, Downspout, piping, Conduits, windows, doors and frames, complete per manufacturer's written instructions.
Bids due in 3 months
1/12/27 2:00pm
2026 Sewer Rehabilitation Project
Bids due in 3 months
City of American Canyon
American Canyon, CA
General description: This project has two distinct work locations and scope. Location A is along the west side of State Route 29 from Crawford Way to Poco Way. Work primarily consists of rehabilitating 2,870 linear feet of existing 10" diameter sewer via pipe-bursting and upsizing to 18” diameter. Location B is on Andrew Road from Donaldson Way to Wilson Way. Work primarily consists of rehabilitating 1,760 linear feet of existing 6" diameter sewer via pipe-bursting and upsizing to 8” diameter.
Bids due in 18 days
10/22/26 2:00pm
Green Island Road Class I Trail
Bids due in 18 days
City of American Canyon
American Canyon, CA
Bids due in 9 days
10/13/26 2:30pm
Oaks Park Slide Repair Project #5033
Bids due in 9 days
City of Orinda
Orinda, CA
General work description: Repair landslide at Orinda Oaks Park: Excavate approximately 780 CY of soil material in slide area to reuse for the repair. Place geogrid layers and reuse soil (and import approximately 80 CY soil fill) to rebuild slope (approximately 880 CY) to repair slide area and conform to original grades. Place jute mesh over affected areas. Note: Project will not begin until circa May 2027, after upcoming winter storm season.