Vasco Road Safety Improvements Project - Walnut Boulevard to Frisk Creek Bridge
The work to be done generally consists of centerline striping removal, installing centerline rumble strip, centerline striping, and channelizer placement along portions of Vasco Road between the intersection with Walnut Boulevard and the Frisk Creek Bridge in eastern Contra Costa County. The work also includes replacing the signal heads and installing backplates with retroreflective edges and installation of battery back-up systems at the intersections of Vasco Road and Walnut Boulevard, and Vasco Road and Camino Diablo.
Status
Accepting Bids
Prebid Date | 6/30/25 11:00am |
Bid Date | 7/15/25 2:00pm |
Company & Contacts
Contra Costa County Public Works Department
Bill King
(925)313-2025
Location
Contra Costa County, CA
Engineer's cost estimate: $628,000
Number of Working Days: 20