Vasco Road Safety Improvements Project - Walnut Boulevard to Frisk Creek Bridge

The work to be done generally consists of centerline striping removal, installing centerline rumble strip, centerline striping, and channelizer placement along portions of Vasco Road between the intersection with Walnut Boulevard and the Frisk Creek Bridge in eastern Contra Costa County. The work also includes replacing the signal heads and installing backplates with retroreflective edges and installation of battery back-up systems at the intersections of Vasco Road and Walnut Boulevard, and Vasco Road and Camino Diablo.

Status

Accepting Bids

Prebid Date 6/30/25 11:00am
Bid Date 7/15/25 2:00pm

Company & Contacts

Contra Costa County Public Works Department
Bill King  
(925)313-2025

Location

Contra Costa County, CA

Documents

Engineer's cost estimate: $628,000

Number of Working Days: 20