Job Calendar

Sun Mon Tue Wed Thur Fri Sat
26
27
28
29
RFP - Office Space Modification
30
31
2021 Annual List of Qualified Bidders Notice Application Fillable
1
2
3
4
5
Installation of Curb Ramps at Various Locations, PW 409-7 Pavement Plugs & Leveling Courses at Various Locations, PW 709-1 RFQ - Community Connectivity Wi-Fi Proof of Concept
6
7
District Nutrition Center Walk-In Freezer and Cooler Replacement Project #1000003528R
8
RFQ- Design-Build Entities Administration Building and Jail Annex Demolition & Redevelopment
9
10
11
12
Smith Saddle Tanks Glen Drive Access Road Improvement Project RFQ - Community Connectivity Wi-Fi Proof of Concept 2021 Treatment Plant Improvements Project (CIP 20708)
13
Pond Levee Maintenance Project - 20707
14
66-inch Trunk Sewer Rehabilitation Project: Kaiser Road to SWRF (CIP 19701) Downtown Sanitary Sewer Upgrade – Phase 3b (Project No. 2446) Contract No. 1916 - Kent Lake Aerator Vent Lines Replacement
15
16
17
18
19
Hillside Natural Road Repairs site 6
20
AT&T Riverside Pedestrian Pathway
21
Contract No. 1916 - Kent Lake Aerator Vent Lines Replacement Fallon Sports Park Phase 3 2020 Pavement Rehab-Bike Path Package Pavement Maintenance – Zone 4 No 2444 Alameda Point Modular Restroom Building Fire Station 66
22
23
24
25
Pole Line Rd-Olive Dr Connection-Montgomery WBAR
26
RFP - Traffic Signal and Street Light Maintenance Hillside Natural Road Repairs site 6
27
28
District Nutrition Center Walk-In Freezer and Cooler Replacement Project #1000003528R Lower Walnut Creek Restoration Project
29
30
31
1
2
2021 Treatment Plant Improvements Project (CIP 20708) AT&T Riverside Pedestrian Pathway Potable Water Reservoir Cleaning and Inspection Project 2021
3
4
Alameda Point Modular Restroom Building North Texas Street Water Main Replacement and Overlay
5