Vasco Road Safety Improvements Project - Walnut Boulevard to Frisk Creek Bridge
The work to be done generally consists of centerline striping removal, installing centerline rumble strip, centerline striping, and channelizer placement along portions of Vasco Road between the intersection with Walnut Boulevard and the Frisk Creek Bridge in eastern Contra Costa County. The work also includes replacing the signal heads and installing backplates with retroreflective edges and installation of battery back-up systems at the intersections of Vasco Road and Walnut Boulevard, and Vasco Road and Camino Diablo.
Plan Holders
Date | Company | Contact |
6/11/25 1:04 pm |
Bay Area Builders Exchange
3055 Alvarado Street San Leandro, CA 94577 |
Jeannie Kwan
Plan Room Coordinator
Tel: 510-483-8880
Fax: 510-352-1509
|
6/11/25 1:04 pm |
Builder's Exchange of San Joaquin County
4561 Quail Lakes Drive, Suite B-2 Stockton, CA 95207 |
Joshlyn Hurles
Planroom Coordinator
Tel: (209) 478- 1000
|
6/13/25 8:20 am |
Construct Connect
30 Technology Pwy S 100 Norcross, GA 30092 |
Morgan Stinson
Content Specialist
Tel: 18003642059
|
6/11/25 1:03 pm |
Construction Bidboard, Inc.
11622 El Camino Real # 100 San Diego, CA |
000 Plan Room
Tel: 800-479-5314
|
6/11/25 1:03 pm |
Dodge Data and Analytics
2860 S State Highway 161 Suite 501 Grand Prairie, TX 75052 |
000 Plan Room
Tel: 413-304-2008
Fax: 306-336-2767
|
6/11/25 1:03 pm |
Marin Builders Exchange
660 Las Gallinas Avenue San Rafael, CA 94903 |
000 Plan Room
Tel: 415-462-1220
|
6/11/25 1:03 pm |
Stockton Builder's Exchange
7500 North West Lane Stockton, CA 95210 |
Jan Luna
Tel: 209-478-1005
|
6/11/25 1:04 pm |
Valley Contractors Exchange
951 8th ST. Chico, CA 95928 |
Elizabeth Carter
Tel: 530-343-1994
|
6/13/25 2:42 pm |
W Bradley Electric inc.
90 Hill road. Novato, CA 94+45 |
Virginia Carroll
Project Coordinator
Tel: 4158981400
Fax: (707)898-5333
|