CN 2008 - Bon Tempe Treatment Plant - Backwash Valve Replacement Project
Description: This contract is for furnishing labor, materials, and equipment for the installation of 24-inch and 8-inch welded steel pipe, 8-inch valve, 24-inch butterfly valves, with fittings, pipe disinfection, below grade vault, installation of associated electrical components, and appurtenances.
Bid Documents for Viewing
(click to expand/collapse)

Name | Size | ||
CN 2008 - Bidding Sheet Schedule | 666.2 KB | ||
CN 2008 - Specifications for Viewing | 2.5 MB |