CN 2008 - Bon Tempe Treatment Plant - Backwash Valve Replacement Project

Description: This contract is for furnishing labor, materials, and equipment for the installation of 24-inch and 8-inch welded steel pipe, 8-inch valve, 24-inch butterfly valves, with fittings, pipe disinfection, below grade vault, installation of associated electrical components, and appurtenances.

Status

Accepting Bids

Prebid Date 9/26/25 10:00am
Bid Date 10/9/25 10:00am

Company & Contacts

Marin Water
Ava Pridgeon  
415-945-1575

Location

The work to be done is located in the Bon Tempe Water Treatment Plant near Fairfax, Ca within the County of Marin, California.

Engineers Estimate: $530,000

A mandatory pre-bid meeting will be held on September 26, 2025 beginning at 10:00 a.m. at the Bon Tempe Water Treatment Plant. RSVP for the pre-bid meeting by September 24, 2025. Any explanation desired by Bidders regarding the meaning or interpretation of any of the contract documents shall be submitted in writing to the District no later than September 30, 2025 at 5:00 p.m.

A digital copy of the bid documents can be emailed to anyone who purchases a hard copy at no additional charge. Just let BPX know when you place the order or you can give us a call at 707-745-3593 or email benicia@bpxprinting.com.