CN 2008 - Bon Tempe Treatment Plant - Backwash Valve Replacement Project

Description: This contract is for furnishing labor, materials, and equipment for the installation of 24-inch and 8-inch welded steel pipe, 8-inch valve, 24-inch butterfly valves, with fittings, pipe disinfection, below grade vault, installation of associated electrical components, and appurtenances.
Plans for Viewing (click to expand/collapse)
Name Size
CN 2008 - Plan Set 98.6 MB