2025/26 Annual Pavement Rehabilitation Project Project #4183/4190

The work to be performed generally consists of pavement rehabilitation of various streets within the City of Orinda. Such work includes, but is not limited to; mobilization, demobilization, temporary traffic control, installation of water pollution control measures, removal & replacement of concrete sidewalk, construction of concrete curb ramps, base failure repair (digout), milling/cold planing, hot mix asphalt (HMA) overlay, microsurfacing, cape seal, adjustment of utility manhole frames and covers, perpetuating survey monuments, adjustment of valve boxes, installation of thermoplastic traffic stripes, thermoplastic pavement markings, blue reflectors, and crosswalks, and all other work as shown on the plans and as described in the Caltrans Standard Specifications and these Special Provisions to provide a complete project.

Status

Accepting Bids

Prebid Date 5/13/26 10:00am
Bid Date 6/2/26 2:00pm

Company & Contacts

City of Orinda
Ha Nguyen  
925-949-9776

Location

Orinda, CA

A pre-bid mee)ng will be held on Wednesday, May 13, 2026, at 10:00 a.m. at the City Offices, (Planning Conference Room) to cover project construction. Prospective bidders attendance is recommended but not mandatory.

ENGINEER’S ESTIMATE (BID): $3,500,000