Elevator Modernization at CCRMC - Main Hospital
The project includes elevator modernization and refurbishments to all six (6) elevators for the main hospital building including all related work including but not limited to electrical, HVAC, fire alarm and fire sprinkler. The work will be phased so only one elevator is out of service at any point in time. All Deferred Approvals, including engineering / design and submission to HCAi, for items such as Elevators (if required), Fire Alarm and Fire Sprinklers will be required under this contract. Maintenance of all six elevators during construction is also part of this contract.
Bid Docs
(click to expand/collapse)

Name | Size | ||
DIV D - PLA MAIN BLDG ELEVATOR MODERNIZATION | 206.9 KB | ||
Division E_Rev-2025 0731 | 361.0 KB | ||
Elevator Modernization CCRMC Front End Specifications | 3.4 MB | ||
Spec S241596-07-00 | 4.6 MB | ||
TIO S241596-07-00-20250710-[1] | 2.5 MB |