West Fremont, St. Francis Water Main Improvements
Project Scope: The project consists of installing approximately 5,500 LF of 8” DIP, and 30 LF of 8” FPVC to replace existing cast iron and asbestos cement pipe, cathodic protection of newly installed water main, installation of 2 combination air valves, 14 fire hydrants, 21 service connections of varying sizes, existing water main/appurtenance abandonments, various surface restorations including slurry seal (~70,000 SF), restriping, among other appurtenance work as identified in the bid schedule.
Status
Accepting Bids
Prebid Date | 9/9/25 10:00am |
Bid Date | 9/23/25 2:00pm |
Location
Los Altos Hills, CA
Cost Estimate: The District’s estimated total construction cost for this project is approximately $2,800,000. The estimate is intended to serve merely as a guideline of the magnitude of work. Neither the bidders nor the contractor shall be entitled to claims because of any inaccuracy in the estimate.
A mandatory pre‐bid meeting and tour is tentatively scheduled for Tuesday, September 9, 2025, at 10:00 A.M. at the District office located at 26375 Fremont Road, Los Altos Hills, CA 94022. Please contact William Lai, P.E. at (925) 224‐7717 to verify the date, time, and location and to receive further updates on this project.