Ohlone Greenway Pavement Repair Project
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done R Mobilization, roadway excavation, demolition, construction of asphalt concrete pavement, cement-lime treated base, grading and drainage as shown on the Plans, as called for in the Specifications, and as directed by the Engineer.