Ohlone Greenway Pavement Repair Project
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done R Mobilization, roadway excavation, demolition, construction of asphalt concrete pavement, cement-lime treated base, grading and drainage as shown on the Plans, as called for in the Specifications, and as directed by the Engineer.
Plan Holders
Date | Company | Contact |
7/21/25 3:48 pm |
Bay Area Builders Exchange
3055 Alvarado Street
San Leandro, CA 94577 |
Jeannie Kwan
Plan Room Coordinator
Tel: 510-483-8880
Fax: 510-352-1509
|
7/21/25 3:48 pm |
Construction Bidboard, Inc.
11622 El Camino Real # 100
San Diego, CA |
000 Plan Room
Tel: 800-479-5314
|
7/21/25 3:48 pm |
Marin Builders Exchange
660 Las Gallinas Avenue
San Rafael, CA 94903 |
000 Plan Room
Tel: 415-462-1220
|
7/21/25 3:48 pm |
Peninsula Builders Exchange
735 Industrial Road
San Carlos, CA 94070 |
000 Plan Room
Tel: (650) 591-4486
|
7/21/25 3:48 pm |
Reed Construction Data
30 Technology Pkwy S., Ste 500
Norcross, GA 30092 |
Plan Room
Tel: 800-876-4045
|
7/21/25 3:48 pm |
San Francisco Builder's Exchange
850 South Van Ness Ave.
San Francisco, CA 94110 |
Deanna Johnson
Tel: 415-282-8220
|
7/21/25 3:48 pm |
Valley Contractors Exchange
951 8th ST.
Chico, CA 95928 |
Elizabeth Carter
Tel: 530-343-1994
|