Water Treatment Plant Tank Rehab 21-02

The scope of work generally consists of the necessary preparations and subsequent installation of three (3) new polypropylene tanks at the Water Treatment Plant, Chemical Tank Farm. Minor electrical, PVC piping and concrete surface rehabilitation are required to complete the installation. All used tanks will be required to be removed from the facility and properly disposed. The project consists of two main phase. Phase 1 includes the installation and successful start up of two Sodium Hydroxide Tanks. Phase 2 includes the removal and installation of an Alum Tank seismic upgrades to three existing tanks. Work associated with Phase 1 shall be completed within 14 Days from the date when Contract Time commences to run as specified in the initial Notice to Proceed. A second Notice to Proceed will be issued for the Phase 2. Work associated with Phase 2 shall be completed within 21 Days from the date when Contract Time commences to run as specified in the Phase II Notice to Proceed. The second Notice to Proceed shall be issued no later than 90 days from the first Notice to Proceed. The estimated cost of construction for the project is $145,000.
Date Company Contact
1633944982
10/11/21 9:36 am
Burlingame Engineers 1225 David Ave
CONCORD, CA 94518
Rodney Scheer
Inside Sales
Tel: 19257081337
Fax: 9259433231
1634028657
10/12/21 8:50 am
ConstructConnect 3825 Edwards Rd.
Suite 800
Cincinnati, OH 45209
Michael Stubbs
Sr. Editorial Content Lead
Tel: 800-364-2059
1633554317
10/6/21 2:05 pm
Construction Bidboard, Inc. 11622 El Camino Real # 100
San Diego, CA
000 Plan Room
Tel: 800-479-5314
1633679729
10/8/21 7:55 am
Dodge Data & Analytics 2860 S State Hwy 161
Ste 160 #501
Grand Prairie, TX 75052
Jayalakshmi L
Other
Tel: 413-376-7032
Fax: 609-336-2767
1633554329
10/6/21 2:05 pm
Marin Builders Exchange 660 Las Gallinas Avenue
San Rafael, CA 94903
000 Plan Room
Tel: 415-462-1220
1633554344
10/6/21 2:05 pm
Solano-Napa Builders Exchange 135 Camino Dorado
Napa, CA 94558
000 Plan Room
Tel: 707-255-2515
1634123412
10/13/21 11:10 am
Telstar Instruments 1717 Solano Way, Unit 34
Concord, CA 94520
Mickie Gardiner
Bid Coordinator
Tel: 916-646-1999
Fax: 916-646-1096
1634053411
10/12/21 3:43 pm
Valentine Corporation 111 Pelican Way
San Rafael, CA 94901
Val McCauley
Tel: 415-453-3732