Canon Dr. Embankment Erosion Repair
The work to be done generally consists of excavating soil to create keyway/bench as shown on plans to allow placement of rock riprap fill buttress on the downslope embankment near 210 Canon Dr. to repair erosion damage from a blocked stormdrain pipe. Install temporary debris fence with steel posts prior to starting machine work.
Specifications
(click to expand/collapse)
Name | Size | ||
Specs and docs - Canon | 9.8 MB |