Canon Dr. Embankment Erosion Repair

The work to be done generally consists of excavating soil to create keyway/bench as shown on plans to allow placement of rock riprap fill buttress on the downslope embankment near 210 Canon Dr. to repair erosion damage from a blocked stormdrain pipe. Install temporary debris fence with steel posts prior to starting machine work.
Addendum 1 (click to expand/collapse)
Name Size
Addendum No. 1- Canon with attachments 11.0 MB