Canon Dr. Embankment Erosion Repair
The work to be done generally consists of excavating soil to create keyway/bench as shown on plans to allow placement of rock riprap fill buttress on the downslope embankment near 210 Canon Dr. to repair erosion damage from a blocked stormdrain pipe. Install temporary debris fence with steel posts prior to starting machine work.
    
    
    
    
    
    
    
            
                                                Addendum 1
                
 (click to expand/collapse)
            
            
 (click to expand/collapse)
            | Name | Size | |||
| Addendum No. 1- Canon with attachments | 11.0 MB | 

