SID Dally Canal Unit South Improvement Project CPW070108
General Work Description: The Project is located on Vanden Road in the City of Fairfield, CA. The work to be performed consists of the following; the removal of an existing portion of concrete canal and replacing the portion with a 36” PVC pipe, installing steel casing for a portion of the PVC pipe, and all other work shown in the Contract documents.
Status
Accepting Bids
| Bid Date | 2/4/26 2:00pm |
Location
Fairfield, CA
The Engineer's Estimate is $170,000

