ADA CURB RAMP IMPROVEMENTS FY 25/26
Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with mobilizing, traffic control, water pollution control, surveying, sawcut, demolition, concrete work including curb, gutter, sidewalk, curb ramps, truncated domes, asphalt patching,, utility lowering and raising. This Project is situated on the following City streets and intersections: Haight Avenue/Fifth Street, Fair Oaks Avenue/St. Charles Street, Clinton Avenue/Cedar Street, Calhoun Street/Post Street, High Street/Briggs Avenue, Santa Clara Avenue/Fountain Street, Eagle Avenue/Mulberry Street, Buena Vista Avenue/Arbor Street, Buena Vista Avenue/Jay Street, Pacific Avenue/Bay Street, Eagle Avenue/Thau Way.
Plans
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| ADA Curb Ramp Improvements FY2526 Plans - Signed | 8.5 MB |

