Construction & Testing of Well 21
The work includes drilling an adjacent shallower well at an existing production well site, as well as performing an 8-hour step pump test and an 8-hour aquifer test.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Vacaville Drilling Well 21 Bid Package | 1.7 MB |

