Phase F - Concrete Improvements PJ 2611 & 2624

Scope of Work: The project is primarily for concrete improvements only. The work to be done in general consists of mobilization; preparatory work (submittals, schedules, ped detour plans, sequence plan, etc.), securing the work area for public safety, and site cleanup daily, clearing and grubbing, traffic control; water pollution control program; placement of Hot Mix Asphalt (HMA); replacement of concrete curb, gutter, curb ramps, and sidewalk; pruning and removal of tree roots; lowering and adjustment of utility covers to finish grade; relocation of roadside signs, temporary striping restorations; and all other work shown on the Plans and as specified in the Project Manual and all other work as specified in these Special Conditions, Technical Provisions, and as shown on the Plans.

Status

Accepting Bids

Bid Date 12/18/25 2:00pm

Company & Contacts

City of Concord - Engineering Services
Kevin Wheat  
925-671-3422

Location

The Project is located in residential areas near Landana Drive and Clayton Way in Concord, California. See project plans for location map.

Engineer’s Estimate: $1,400,000 to $1,700,000.