Project Description/Scope of Work: This project is an upgrade to a segment of the existing North Bay Aqueduct pipeline that parallels the Silverado Trail and crosses the Conn Creek floodway to provide water to the City of Calistoga. The existing 12” pipeline under the streambed has been exposed to heavy scour and erosion and a concrete cap was placed over the pipeline during an emergency repair. The main purpose of the project is to remove the concrete cap and existing pipeline from the creek, so it won’t impede fish passage. The new pipeline will be mounted on the Caltrans bridge which was recently reconstructed, and inserts were installed to support the new pipeline.

Status

Accepting Bids

Prebid Date 12/10/25 2:00pm
Bid Date 1/7/26 2:00pm

Company & Contacts

City of Calistoga
David Fradelizio, Dfradelizio@calistogaca.gov & Linda Scroggs, linda.scroggs@consoreng.com  

Location

Calistoga, CA

Reference

The Engineer’s Estimate for the base bid is $1,840,000.

The City will conduct a non-mandatory pre-bid meeting on December 10, 2025 at 2:00 P.M. The meeting will take place at the job site Calistoga, CA 94515. The City encourages all prospective bidders and subcontractors to attend. Bidders who do not attend the pre-bid meeting will be responsible for their bids, and all provisions thereof, to the same extent as those bidders that did attend. Those bidders who do not attend the pre-bid meeting will not be excused from their bid or any provision thereof on account of information that was available at the pre-bid meeting.