Community Competition Swimming Pool Re-Plastering Project No. C3050.9
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of: Demolition of existing pool plaster and tiles to existing bare concrete shell of the Competition Swimming Pool. Re-tile and re-plaster.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Project Manual C3050.9 2025-1103 Stamped_City signed | 1.5 MB |

