Mankas Blvd. Distribution Main Replacement
General Work Description: Installation of approximately 1,100 linear feet of 8-inch diameter potable water pipeline and appurtenances, abandonment of approximately 1,600 linear feet of 16-inch diameter potable water pipeline, partially located beneath Interstate 80, 2-inch grind and overlay of Mankas Blvd, and ADA curb ramps installation where pipeline replacement is planned.
Status
Accepting Bids
| Prebid Date | 11/6/25 10:00am |
| Bid Date | 11/18/25 2:00pm |
Location
Fairfield, CA
The engineer’s estimate is $1,555,000.
A mandatory pre-bid meeting for prospective bidders of the project will be conducted by the OWNER at 10:00AM on November 6, 2025. The meeting will be located at 2000 Cadenasso Drive, Fairfield, CA 94533.