2025 Street Tree Planting - Phase 1
In general, the work includes temporary traffic control, installation of 15-gallon trees within existing street medians per details and specifications, adapting spray irrigation to bubbler irrigation to the newly installed trees, and establishment and maintenance of trees and irrigation systems for a period of three years.
Status
Bidding Closed
Bid Date | 10/8/25 2:00pm |
Location
Martinez, CA
The Engineer’s Estimate is: $300,000.00
There is no pre-bid meeting for this work; however, contractors are strongly encouraged to visit all sites in advance of the bid to familiarize themselves with the nature of the existing conditions.