2025-2026 Water Main Replacement Project No. C7067

Description of Work: In general, the work includes the water main and service replacements at various locations in the City of Martinez. The work includes, but is not limited to the following: Replacing approximately 4,700 linear feet of water main to address undersized, aging, and deteriorating pipelines to minimize failures and improve fire flows. The project consists of water main replacement including valves and fire hydrants, tie-in of new mains to existing mains, replacement of service laterals up to existing water meters, blow-offs, air release valves, fittings, and associated appurtenances. The project also includes removing and replacing curb ramps, miscellaneous sidewalk improvements, subdrain pipe improvements, pavement rehabilitation, and striping restoration.

Status

Accepting Bids

Bid Date 8/14/25 2:00pm

Company & Contacts

City of Martinez
Trevor McGuire  

Location

Martinez, CA

Engineer's Estimate

Bid Schedule A: $3,250,000

Bid Schedule B: $250,000

Grand Total: $3,500,000

There is no pre-bid meeting for this work; however, contractors are strongly encouraged to visit all sites in advance of the bid to familiarize themselves with the nature of the existing conditions.