Measure T Washington Street Rehabilitation MT-3026
General Description of Work: The work generally consists of mobilization, developing, implementing and maintaining a traffic control system and water pollution control program, cold planing, removing and disposing of existing pavement, placement of hot mix asphalt materials, lowering and adjusting utility covers, installing traffic striping, pavement markings, and roadside signs, cleanup of the project areas, and other items of work as shown in the contract documents.
Specifications
(click to expand/collapse)

Name | Size | ||
MT 3026 final Spec | 1.7 MB |