Pavement & Curb Rehabilitation Project - Marin Ave Phase 2

Work generally includes, but is not limited to, 2-inch to 3-inch HMA milling, 4-inch cold in-place recycling, 2-inch to 3-inch HMA inlay, 12-inch full depth HMA, sidewalk, curb, gutter, and curb ramp improvements, installation of storm drain inlets and other storm drain improvements, installation of traffic striping, pavement markings, and K71 reflective bollards, improvements at existing traffic signals, and installation of Rectangular Rapid Flashing Beacons. The Project also includes a bid alternative for intersection street lighting improvements.

Status

Accepting Bids

Bid Date 6/11/25 2:00pm

Company & Contacts

City of Albany
James Cirelli  

Location

Albany, CA

Documents

The estimated construction cost is $5,700,000. This estimated construction cost is for the base contract scope of work and does not include the bid alternate scope of work.