The work to be performed consists, in general, of constructing/reconstructing accessible curb ramps, failed and damaged sections of existing curb, gutter and sidewalk, reconstructing and relocating drainage inlets, removal and replacement of deteriorated storm drain pipe, restoring and /or relocating traffic striping, legends and markers, and all other work as shown the contract documents.
Addendum 1
(click to expand/collapse)

Addendum 2
(click to expand/collapse)

Name | Size | |||
Addendum 2 | 5.8 MB |
Addendum 3
(click to expand/collapse)

Name | Size | |||
Addendum 3 | 485.9 KB |
Addendum 4
(click to expand/collapse)

Name | Size | |||
Addendum 4 | 290.0 KB |