ADA Modification, Curb Ramp and Sidewalk Project
Mobilization; traffic control; roadway excavation, AC paving and AC plug; Storm Drain, top soil and mulch; concrete sidewalk, driveway, curb and gutter; tree protection and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Status
Bidding Closed
| Prebid Date | 3/27/24 1:00pm |
| Bid Date | 4/2/24 2:00pm |
Location
City of El Cerrito
A non-mandatory pre-bid conference will be held at 1:00 p.m., on Wednesday, March 27, 2024, at the El Cerrito City Hall, 10890 San Pablo Avenue, El Cerrito, California, 94530.

