Kennedy High School 900s Portable Demolition
The project consists of abatement of six (6) portables (Rooms 905-910) per the Specifications and Demo Drawings. Demolish and Remove the six (6) portable classrooms from the campus. Safely disconnect the utility connections to the portables prior to demolition. Patch/cap utilities as needed to maintain operation of remaining portables. Concrete building footings to be demolished and removed from site.
Addendum 1
(click to expand/collapse)

Addendum 2
(click to expand/collapse)

Name | Size | |||
Addendum No. 2 Kennedy HS 900s Portable Demolition, Project #1000004298 | 358.4 KB |
Addendum 3
(click to expand/collapse)

Name | Size | |||
Addendum No. 3 Kennedy HS 900s Portable Demolition, Project #1000004298 | 375.8 KB |