Kennedy High School 900s Portable Demolition

The project consists of abatement of six (6) portables (Rooms 905-910) per the Specifications and Demo Drawings. Demolish and Remove the six (6) portable classrooms from the campus. Safely disconnect the utility connections to the portables prior to demolition. Patch/cap utilities as needed to maintain operation of remaining portables. Concrete building footings to be demolished and removed from site.