Yajome Sidewalk Repair Project - (SW23PW01)
The work generally consists of sidewalk repair and construction of a new concrete driveway and reinforced concrete car port. Additionally, two mature trees are to be removed.
    
    
    
    
    
    
    
            
                                                Plans
                
 (click to expand/collapse)
            
            
 (click to expand/collapse)
            | Name | Size | ||
| BID-Set-SW23PW01-2023-04-18 | 1.9 MB | 

