Residential Pavement, Phase A:Zones 1B, 2B, 2E, 3B, 4Q & 5L City Project Nos. 2516, 2514, 2561 , 25
The work to be done in general consists of mobilization; traffic control; water pollution control program; cold planning of asphalt roadway; placement of Hot Mix Asphalt (HMA) materials; removal and replacement of concrete sidewalk, curb, gutter, curb ramps, driveways and valley gutters; pruning and removal of tree roots; lowering and adjustment of utility covers to finish grade; removal and replacement of traffic striping and pavement markings; relocating roadside signs; installing new video detection systems, and all other work shown on the Plans and as specified in these Speical Provisions.
    
    
    
    
    
    
    
            