Browns Valley Trunk Project (CIP 14703)

The Project primarily includes installation of approximately 3 miles of sanitary sewer trunk main ranging in size from 48-inch to 15-inch diameter and other components as shown in the Project technical specifications and plans in the bid package. The pipeline will be located within South Coombs Street, Spruce Street, Franklin Street, Sycamore Street, Jefferson Street, Old Sonoma Road, crossing of Highway 29 at Old Sonoma Road, Freeway Drive, 1st Street, and Browns Valley Road. A valid Class A California contractor’s license is required to bid on the Project.

Status

Bidding Closed

Prebid Date1/9/20 2:00pm

Bid Date2/11/20 2:00pm

Company & Contacts

NapaSan
Robin Gamble Holley: rgamble@napasan.com  
707-258-6031

Location

Napa, CA

Bid Opening: February 11th, 2020 at 2:00PM

Estimated cost of construction is $21,000,000 ($21M)

A mandatory pre-bid conference will be held at 2:00 pm on January 9, 2020 at 1515 Soscol Ferry road, Napa, CA.

This Project is SRF funded. Contractors submitting a bid are required to perform Good Faith Efforts, including posting solicitations for bids and proposals to Disadvantaged Business Enterprises (DBE) for a minimum of 30 calendar days before the bid opening.