Tara Hills Full Trash Capture

The work to be done generally consists of installing prefabricated Trash Treatment Control Devices (TTCD) at three locations in the Tara Hills area. Work includes temporary water diversion and dewatering, roadway and structure excavation, temporary shoring, installation of TTCD units, reconstruction of sidewalk and roadway, and replacing roadway striping.
Plans (click to expand/collapse)
Name Size
CCC_Plans_Full_7079 1.4 MB
Specifications (click to expand/collapse)
Name Size
CCC_NTB_7079 128.3 KB
CCC_PC_7079 1.3 MB
CCC_SP_7079 15.5 MB