Catherine Court to Martha Road Trail Maintenance Project

The work to be done generally consists of the maintenance of an existing AC pathway including but not limited to: mobilization; traffic control and public convenience including notifications; temporary water pollution control; locating and protecting existing utilities, fencing and improvements; providing an arborist; clearing and grubbing including tree/root trimming and protection; tree removals; spot repairs of existing 15” and 30” Reinforced Concrete Pipe; improving the existing AC pathway by constructing base failure repairs, crack seals and slurry seals; constructing minor concrete structures including retaining curbs and a headwall; and installation of rock slope protection and a 12” PVC pipe encased in concrete with a trash screen.
No files available