Southern Marin Pipeline Replacement Project
The work to be done includes, but is not limited to, the following: installation of approximately 120 feet of 10" high density polyethylene (HDPE) pipe by directional drill method, 310 feet of 8-inch welded steel pipe and 100 feet of 1/4" thick welded steel casing with valves, fittings, pipeline disinfection and appurtenances.
Status
Bidding Closed
Bid Date10/5/21 10:00am
Company & Contacts
Marin Municipal Water District
Jake Miller
415-945-1580
Location
Marin County, California
Electronic files available upon request with the purchase of a hard copy.
BIDS DUE BY: TUESDAY, OCTOBER 5TH, 2021 @ 10:00 AM
ENGINEER’S ESTIMATE: $200,000