City of Orinda - 2020 Orinda Pavement Rehabilitation Project

The work to be performed generally consists of pavement rehabilitation and storm drain improvements of 7 roads and crack seals of various streets within the City of Orinda. The pavement treatment methods include Mill & Overlay and Micro Surfacing and base failure for both type of treatment. Work to be performed also includes replacing storm drain pipes using open trench or rehabilitating storm drains using trenchless technology, replacement of curb and gutter, concrete or asphalt lined ditches and asphalt dikes, pavement striping, lowering and raising of utility covers, replacing detector loops, locating and preserving survey monuments and filing of appropriate record documents with County recorder’s office.

Status

Accepting Bids

Prebid Date6/12/20 10:00 am

Bid Date6/23/20 2:00 pm

Company & Contacts

City of Orinda

Farah Khorashadi   (925) 253-4282

Location

City of Orinda

PRE-BID MEETINGFRIDAY, JUNE 12TH, 2020 @ 10:00 AM

The City Clerk will receive sealed bids at the City Offices, 22 Orinda Way, Orinda, California 94563, ONLY BETWEEN THE HOURS OF 12:00 p.m. and 2:00 p.m., on Tuesday, June 23rd, 2020

Engineer’s cost estimate: $4,600,000+