Skip to main content

City of Orinda - 2020 Orinda Pavement Rehabilitation Project

The work to be performed generally consists of pavement rehabilitation and storm drain improvements of 7 roads and crack seals of various streets within the City of Orinda. The pavement treatment methods include Mill & Overlay and Micro Surfacing and base failure for both type of treatment. Work to be performed also includes replacing storm drain pipes using open trench or rehabilitating storm drains using trenchless technology, replacement of curb and gutter, concrete or asphalt lined ditches and asphalt dikes, pavement striping, lowering and raising of utility covers, replacing detector loops, locating and preserving survey monuments and filing of appropriate record documents with County recorder’s office.
Download Download section as a Zip file free of charge
Filetype Icon Name Size Quick Download
18.8 MB Download
746.2 KB Download
53.4 KB Download
344.7 KB Download
Download Download section as a Zip file free of charge
Filetype Icon Name Size Quick Download
345.0 KB Download
754.0 KB Download
67.6 KB Download
2.0 MB Download
Pipes Proposed for Repair.zip 18.5 MB Download