McCormack Road Improvement Phase 2

General work description: 1) reconstruct an existing 24-foot-wide gravel road to a 32-foot-wide Hot Mix Asphalt road with 4-foot dirt shoulders, 2) road construction to a new design profile, and mass grading 3) reconstruct the road with Full Depth Reclamation - Concrete (FDR-C), 4) pave roadway with 2” thick HMA (1/2” Type A) over 3” thick HMA (3/4” Type A, 5) striped with Thermoplastic striping, 6) new roadway signs, and 7) erosion control measures.
Plans (click to expand/collapse)