Bus Wash Replacement Project
Demolition and removal of the existing bus wash and wash water reclamation system; site clearing; alteration of existing utilities; addition of new utilities; construction of equipment room, partially-enclosed structural canopy, new bus wash system including wash water reclamation system; landscaping; concrete pavement; and transitioning of new work to areas of existing grade. The new bus wash system equipment will be Owner-furnished under a separate, previously awarded procurement contract with the Bus Wash System Manufacturer, with installation assigned to the Construction Contract.
Plans
(click to expand/collapse)
Name | Size | ||
Bus Wash System Plans - FOR REFERENCE ONLY | 3.3 MB | ||
WESTCAT BID SET 2020.02.07 | 49.8 MB |