Yajome Sidewalk Repair Project - (SW23PW01)
The work generally consists of sidewalk repair and construction of a new concrete driveway and reinforced concrete car port. Additionally, two mature trees are to be removed.
Plans
(click to expand/collapse)

Name | Size | ||
BID-Set-SW23PW01-2023-04-18 | 1.9 MB |