Citywide Arterial & Collector Maintenance Project #2, PJ No. 2527

The work to be done in general consists of mobilization; traffic control; water pollution control program; crack sealing; type II slurry seal with black rock; digouts; reconstructing concrete sidewalk, curb, gutter, curb ramps, valley gutter and catch basins; pruning and removing tree roots; lowering and adjusting utility covers to finish grade; removal & replacement of traffic striping and pavement markings; installation of roadside signs and tuff curbs; and all other work shown on the Plans and as specified in these Special Provisions.
Addendum 1 (click to expand/collapse)
Name Size
2023-4-3_2527 Addendum No 1 175.6 KB