Pavement Maintenance - Zone 5J Project No. 2526

The work to be done in general consists of mobilization; traffic control; water pollution control program; cold planning and wedge grinding of asphalt roadway section; installation of Hot Mix Asphalt (HMA) overlays; removal & replacement HMA including; dig-out repairs; removal & replacement of concrete sidewalk, curb & gutter, curb ramps, driveways and valley gutters; pruning and removal of tree roots; adjustment of utility covers to finish grade; removal of storm drain inlets, manholes and pipes and installation of new storm drain structures and pipes via open trench; removal & replacement of traffic striping and pavement markings; removal and re-installation of roadside signs; and all other work shown on the Plans and as specified in these Special Provisions.
Specifications (click to expand/collapse)
Name Size
PJ2526 Zone 5J SPECS 30.3 MB