Pavement Maintenance - Zone 5J Project No. 2526

The work to be done in general consists of mobilization; traffic control; water pollution control program; cold planning and wedge grinding of asphalt roadway section; installation of Hot Mix Asphalt (HMA) overlays; removal & replacement HMA including; dig-out repairs; removal & replacement of concrete sidewalk, curb & gutter, curb ramps, driveways and valley gutters; pruning and removal of tree roots; adjustment of utility covers to finish grade; removal of storm drain inlets, manholes and pipes and installation of new storm drain structures and pipes via open trench; removal & replacement of traffic striping and pavement markings; removal and re-installation of roadside signs; and all other work shown on the Plans and as specified in these Special Provisions.

Status

Bidding Closed

Bid Date3/9/23 2:00pm

Company & Contacts

City of Concord - Engineering Services
Kevin Wheat  
Kevin.Wheat@CityofConcord.org

Location

Concord, CA

The estimated construction cost is $3,500,000

There will be no pre-bid conference for this project; however, bidders are highly encouraged to visit the site.