Treat Boulevard Pavement Rehabilitation Project (Phase 1) No. 2559

The work to be done in general consists of mobilization, traffic control, water pollution control, demolition, tree removal, potholing of existing utilities, street asphalt concrete pavement by full depth reclamation method, asphalt concrete grind and overlay, concrete curb and gutter, concrete sidewalk, concrete ADA ramp construction, utility cover adjustments, traffic striping, pavement markings and markers, landscape, fiber optic installation, video detection systems, and all other work as shown on the Plans and as specified in these Special Provisions.
Addendum 1 (click to expand/collapse)
Name Size
PJ 2559 Addendum No. 1 FINAL 9.2 MB
Addendum 2 (click to expand/collapse)
Name Size
PJ 2559 Addendum No. 2 FINAL 827.8 KB