Oak Grove Road Pavement Rehab – Phase 3 Project No. 2557

The work to be done in general consists of mobilization; traffic control; water pollution control program; cold planning of asphalt roadway section; cold in-place recycling (CIR); placement of Rubberized Hot Mix Asphalt (RHMA) overlay; localized removal & replacement HMA; fiber optic conduit and pull boxes, removal & replacement of traffic loops, concrete curb & gutter, curb ramps, and valley gutters; pruning and removal of tree roots; lowering and adjustment of utility covers to finish grade; removal & replacement of traffic striping and pavement markings; installation of trash capture devices; installation of roadside signs; and all other work shown on the Plans and as specified in these Special Provisions.
Plans (click to expand/collapse)