2022 Annual Paving Project and Moraga Way Pedestrian Pathway Project

The work to be performed generally consists of pavement rehabilitation and storm drain improvements of various streets within the City of Orinda. The pavement treatment methods include Mill & Overlay, Reconstruction, and Micro Surfacing with base failures. Work to be performed also includes replacing storm drain pipes using open trench or rehabilitating storm drains using trenchless technology, replacement of rolled curbs and asphalt dikes, pavement striping, pavement widening for a new ADA-compliant path, lowering and raising of utility covers, replacing detector loops, locating and preserving survey monuments and filing of appropriate record documents with County recorder’s office.

Status

Bidding Closed

Prebid Date6/2/22 10:00am

Bid Date6/28/22 2:00pm

Company & Contacts

City of Orinda
Farah Khorashadi: FKhorashadi@cityoforinda.org  
925-253-4279

Location

City of Orinda

ENGINEER’S ESTIMATE: $2,660,000