Fire Station No. 4 Renovations

PROJECT A: Building Permit Number 157846. Barrier removal at the existing building. The interior remodel will include required accessibility upgrades to the restrooms & showers, and accessible path of travel. Exterior alterations to include required accessible compliant parking, accessible path of travel, and replacement of second floor windows with new insulated glass windows to match existing.B. PROJECT B: Building Permit Number 87745. Seismic retrofit of the apparatus bay, offices, and living quarters. Work also includes architectural repair resulting from the seismic retrofit. The entire Fire Station 4 facility and site outside the area of work is to remain fully operational at all times. The following represents a description of phases and an abbreviated description of the work (not necessarily in sequence given) within each phase. Contractor shall provide detailed phasing and schedule at the pre-construction conference.