Oak Grove Road Pavement Rehab Ph 2 No 2423

The work to be done in general consists of mobilization, traffic control, storm water pollution control, street pavement rehabilitation, pavement milling, cold-in-place recycling, placement of hot mix ashalt concrete, ADA ramp construction, traffic striping and markings, installation of video detection cameras, adjustment and relocation of pedestrian push buttons and all other work shown on the plans and special provisions.
Addendum 1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2020-01-06_2423 Addendum No 1 900.7 KB
Add1 - 12-CD-02R-CD-2 456.9 KB