Solids Processing Facility-Fire Alarm and Detection System Replacement

Replacement of the existing fire alarm and detection system throughout the existing Solids Processing Facility. The Solids Processing Facility consists of three levels: Ground Floor ~9,775 SF; 2nd Floor ~11,140 SF; and Mezzanine Level ~1,565 SF. The facility is constructed of concrete and consists of deep beam pockets. Existing conduit located within concrete wall and above hard ceilings will be reused. The new fire alarm and detection system shall be an addressable system designed, installed, and fully functional in compliance with all adopted codes and standards and AHJ approval.

Status

Accepting Bids

Prebid Date11/30/21 10:00am

Bid Date12/9/21 2:00pm

Company & Contacts

Vallejo Waste Water District

Gustavo Silva   707-652-7809

Location

Vallejo, CA

Construction Cost Estimate: $400,000